{"id":332195,"date":"2023-06-12T14:17:00","date_gmt":"2023-06-12T14:17:00","guid":{"rendered":"https:\/\/haftavasool.com\/haftavasool\/blog\/2023\/06\/12\/ayodhya-ram-temple-phase-1-in-last-lap-ground-floor-to-be-ready-by-diwali\/"},"modified":"2023-06-12T14:17:00","modified_gmt":"2023-06-12T14:17:00","slug":"ayodhya-ram-temple-phase-1-in-last-lap-ground-floor-to-be-ready-by-diwali","status":"publish","type":"post","link":"https:\/\/haftavasool.com\/haftavasool\/blog\/2023\/06\/12\/ayodhya-ram-temple-phase-1-in-last-lap-ground-floor-to-be-ready-by-diwali\/","title":{"rendered":"Ayodhya Ram Temple Phase 1 In Last Lap, Ground Floor To Be Ready By Diwali"},"content":{"rendered":"<p> [ad_1]<br \/>\n<\/p>\n<div itemprop=\"articleBody\" id=\"ins_storybody\"><!-- \n\n<div itemprop=\"articleBody\" class=\"sp-cn ins_storybody\" id=\"ins_storybody\">--><\/p>\n<div class=\"ins_instory_dv\">\n<div class=\"ins_instory_dv_cont\"><img decoding=\"async\" title=\"Ayodhya Ram Temple Phase 1 In Last Lap, Ground Floor To Be Ready By Diwali\" alt=\"Ayodhya Ram Temple Phase 1 In Last Lap, Ground Floor To Be Ready By Diwali\" id=\"story_image_main\" src=\"https:\/\/c.ndtvimg.com\/2023-06\/53rrda94_ayodhya-ram-temple_625x300_12_June_23.jpg\"\/><\/div>\n<\/div>\n<p><b class=\"place_cont\">New Delhi: <\/b><\/p>\n<p>The ground floor of the three-storied Ram temple in Ayodhya will be completed by October this year, sources have said. The temple will be consecrated next January &#8212; at the beginning of the election year.<\/p>\n<p>The work on the ground floor is at the final stage and Ram Janambhoomi Trust member Nripendra Mishra took stock of the situation today, sources said.<\/p>\n<p>Last year, Union home minister Amit Shah had promised that the temple will be ready for opening by January 1.<\/p>\n<p>It is expected to be a milestone for the ruling BJP, which considers the temple movement the fulcrum for its emergence as a national electoral force in the 1990s.<\/p>\n<p>The construction at the site started in August 2020 after the Supreme Court ended decades of legal wrangle with a milestone verdict in 2019 that went in favour of a temple.<\/p>\n<p>The 360 ftX235 ft structure will have 160 columns on the ground floor, 132 columns on the first floor and 74 columns on the second floor. There will be five &#8220;mandaps&#8221; or pavilions. The temple will have 46 doors made of teak wood. The door of the sanctum sanctorum will be gold studded.<\/p>\n<p>Around four lakh cubic feet of stone and marble from Rajasthan will be used for the structure, which will tower 161 feet over the sanctum sanctorum &#8212; there will be no use of steel or bricks.<\/p>\n<p>The other structures inside the complex, a Shiva temple on Kuber mound and the statue of Jatayu, are expected to attract devotees.<\/p>\n<p>The complex will also include a pilgrim facilitation centre, museum, archives, research centre, auditorium, a cattle shed, a place for rituals, an administrative building and rooms for priests.<br \/>The date for the consecration of the statue has not been fixed. It is likely to take place after Makar Sankranti.<\/p>\n<p>Prime Minister Narendra Modi \u2013 who laid the foundation stone on August 5 2020 &#8212; will be present for the ceremony.<\/p>\n<\/div>\n<p>[ad_2]<br \/>\n<br \/><a href=\"https:\/\/www.ndtv.com\/india-news\/ayodhya-ram-temple-construction-in-last-lap-will-be-complete-by-october-4115290\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>[ad_1] New Delhi: The ground floor of the three-storied Ram temple in Ayodhya will be completed by October this year, sources have said. The temple will be consecrated next January &#8212; at the beginning of the election year. The work on the ground floor is at the final stage and Ram Janambhoomi Trust member Nripendra [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":332196,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[345,867],"_links":{"self":[{"href":"https:\/\/haftavasool.com\/haftavasool\/wp-json\/wp\/v2\/posts\/332195"}],"collection":[{"href":"https:\/\/haftavasool.com\/haftavasool\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/haftavasool.com\/haftavasool\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/haftavasool.com\/haftavasool\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/haftavasool.com\/haftavasool\/wp-json\/wp\/v2\/comments?post=332195"}],"version-history":[{"count":0,"href":"https:\/\/haftavasool.com\/haftavasool\/wp-json\/wp\/v2\/posts\/332195\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/haftavasool.com\/haftavasool\/wp-json\/wp\/v2\/media\/332196"}],"wp:attachment":[{"href":"https:\/\/haftavasool.com\/haftavasool\/wp-json\/wp\/v2\/media?parent=332195"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/haftavasool.com\/haftavasool\/wp-json\/wp\/v2\/categories?post=332195"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/haftavasool.com\/haftavasool\/wp-json\/wp\/v2\/tags?post=332195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}